Update: Road Maintenance at TWP 590

The road at RR 80 to RR 72 has been reopened, but construction on TWP 590 is still ongoing.

Please be mindful of work crews and posted traffic signage. Motorists are thanked for their cooperation during this temporary interruption.


Print   Email